Plastering, skim-coating, levelling, and surface repair before paint or wallpaper. We check moisture levels, assess cracking, and test substrate adhesion so the finish lasts. Wall work is sequenced before wiring is closed and before carpentry is installed.
Typical timeline · 1–3 weeks depending on wall area and condition.
Enquire Now →Common problems this solves.
Walls painted over cracks that reappear within months
Moisture trapped behind new plaster causing blistering
Electrician chases walls after plastering — double work and patchy finish
Uneven surfaces that telegraph through paint and wallpaper
What is included
- Moisture and substrate assessment
- Crack repair and surface levelling
- Plastering and skim-coating
- Coordination with electrical and carpentry schedule
- Pre-paint surface inspection
How the work is planned
- 01Inspect all wall surfaces for moisture, cracking, and adhesion
- 02Repair cracks and level uneven areas
- 03Apply plaster and skim-coat to specification
- 04Coordinate timing with electrical rough-in and carpentry install
- 05Final inspection before paint or wallpaper
Service questions
Do you handle wall tiling?
We prepare the substrate for tiling. Tiling itself is done by our partner contractors under our supervision.
What about waterproofing?
Yes — wet area waterproofing is part of wall preparation for bathrooms and kitchens.
Need this coordinated with your renovation timeline?
Share your property type, location, and renovation stage. We will help you understand what should be planned first before site work begins.
Discuss This Service →