TSTIMBERSTONE
Service

Plaster Ceiling

Plastering, skim-coating, levelling, and surface repair before paint or wallpaper. We check moisture levels, assess cracking, and test substrate adhesion so the finish lasts. Wall work is sequenced before wiring is closed and before carpentry is installed.

Typical timeline · 1–3 weeks depending on wall area and condition.

Enquire Now →
Before You Start

Common problems this solves.

01

Walls painted over cracks that reappear within months

02

Moisture trapped behind new plaster causing blistering

03

Electrician chases walls after plastering — double work and patchy finish

04

Uneven surfaces that telegraph through paint and wallpaper

Scope

What is included

  • Moisture and substrate assessment
  • Crack repair and surface levelling
  • Plastering and skim-coating
  • Coordination with electrical and carpentry schedule
  • Pre-paint surface inspection
Process

How the work is planned

  1. 01Inspect all wall surfaces for moisture, cracking, and adhesion
  2. 02Repair cracks and level uneven areas
  3. 03Apply plaster and skim-coat to specification
  4. 04Coordinate timing with electrical rough-in and carpentry install
  5. 05Final inspection before paint or wallpaper
FAQ

Service questions

Do you handle wall tiling?

We prepare the substrate for tiling. Tiling itself is done by our partner contractors under our supervision.

What about waterproofing?

Yes — wet area waterproofing is part of wall preparation for bathrooms and kitchens.

Next Step

Need this coordinated with your renovation timeline?

Share your property type, location, and renovation stage. We will help you understand what should be planned first before site work begins.

Discuss This Service →
Enquire Now